VINTAGE RUNABOUT -NEW WINTER PROJECT?
Threw a dart at a bunch of free plans and came up with this one (old MM plan) No matter what I chose, I would always see something else and wish I'd built that instead, but this has possibilities for a few improvements to the hull and a bit of room for extra 'stuff'. I had it printed originally to A-O size, but it came out a tad large, so I scaled it back to 33" x 10" which should make a good sized model. If I'd gone with the original print size (48") it would have required a weed-eater motor, my own forest, and a trailer😁. At 33" it will suit 3ft balsa sheets.
Went up to the print place and got it done yesterday, came home and did the bulkhead tracings, then transferred those to some 4mm light ply and cut them roughly to size. Later today I might give them a haircut to the final shape with my small bandsaw. Next job will be to find some spruce for the framing, which could be a challenge, as the main (almost only) model shop in Auckland, is a bit light on for most modelling wood at present.
I'll build it my usual way, - upside down with a central square hardwood spine screwed to the board, with the tops of the bulkheads notched to fit over it and all blocked in place. Once planked and glassed, the spine can be cut out in the required areas. This model could take a while, as I have a dozen other jobs which need doing.
Went up to the print place and got it done yesterday, came home and did the bulkhead tracings, then transferred those to some 4mm light ply and cut them roughly to size. Later today I might give them a haircut to the final shape with my small bandsaw. Next job will be to find some spruce for the framing, which could be a challenge, as the main (almost only) model shop in Auckland, is a bit light on for most modelling wood at present.
I'll build it my usual way, - upside down with a central square hardwood spine screwed to the board, with the tops of the bulkheads notched to fit over it and all blocked in place. Once planked and glassed, the spine can be cut out in the required areas. This model could take a while, as I have a dozen other jobs which need doing.