PS Enterprise

投稿者 rcmodelboats 12 エントリー(複数) 1 1月 2019 — 30 3月 2020
50いいね数
11コメント
章 01 / 12

12 章 · ページ 1 の 2

rcmodelboats 最初の投稿

PS Enterprise

This model is intended to be used to carry camera such as a go pro. my current camera vessel is a barge and I can't turn the barge without it looking bad on video so I wanted a vessel that can move under its own power but not too fast. The model is 1/20 and will have 2 paddles wheels, one on each side. This particular vessel is currently in Canberra NSW but it used to operate in Uchuka NSW.
がいいねしました Joe727 and Colin H

PS Enterprise

The lip so it is as water light as possible is now made and the motor assembly will be made look like a boiler when fully completed.
がいいねしました Colin H and RNinMunich and

boiler and struts

As this model will be Electric a mock boiler will be put in place for aesthetics as it can be seen clearly if you look directly front on, on the real ship. The struts that come out of the hull are for a extra piece of deck that then connects to the paddle boxes.
がいいねしました Colin H and Joe727 and

PS Enterprise

The boiler is coming along nicely and the deck is glued down. The chain rudder servo is in place.
がいいねしました Colin H and Joe727 and

PS Enterprise

The bow section of the top deck is made and is now Varnished, some pins as rivets on the bow, the Rudder shaft supports with pins as rivets and now the top deck stern section needs to.be made. The stern section has gaps in the wood.
がいいねしました Inkoust and Colin H and

PS Enterprise

The Top deck is now complete. The hull is partially painted and the construction of the superstructure has begun and the rudder is now attached
がいいねしました Inkoust and Colin H and

Superstructure frames and log box

The structural frame for the superstructure is now in place along with the 2 sides of the superstructure. The log box is being built and the little details are starting to go on.
がいいねしました mturpin013 and MouldBuilder and

PS Enterprise paddle steamer update

The lower superstructure is basically done, the top deck is cut out, the lower section of the structure is painted and the paddle box faces are built. Next is the paddles and electrics
がいいねしました jbkiwi and RonH and

Enterprise

The paddle wheel is printed with the second on the way, shaft gear is in place with the motor about to be installed. The rear deck sides are rounded and will be painted soon.
がいいねしました MouldBuilder and jbkiwi and

Delete this post?

サイトから削除されます。

この下書きを破棄しますか?

下書きは削除され、復元できません。

未完成の下書きがあります

どう扱いますか?